Erik Eberhardt, director of geological engineering at UBC, spoke to the Vancouver Sun about alternative ways of connecting the North Shore with Metro Vancouver.
He said the challenges of building a tunnel would be the geology and geography on either side of the Burrard Inlet.
The story also appeared in The Province.